Monday, 11 May 2015

The X-Axis

The X-Axis

Issues 16 - 19


This will be a quick one as there isn't much to it.

So, the x-axis runner parts are here.



This is where I left off with the main frame.



Parts out of the bag. Can you guess where they're going to go?



I won't bore you with the stages here as it's the same as the y-axis. The difference is that they are attached directly to the main frame as opposed to it's own individual module.



Here's the completed timing belt bearing (Can you tell I'm padding?). Again, no point is showing little stages. Difference between this one as the y-axis one is that the tool-kit had arrived and I had their supplied set of needle nose pliers.



Finished this section.



Here's the complete main frame so far



Next up is the belt, belt attachments and motor for the x-axis. I'll post that part, but depending on what is next I might save up the instalments so I have bigger sections to complete.

This is going to be a long build. It will be totally worth it in the end and when I run off my first few things I will be pretty chuffed, it's just a slow process. I'm not overly patient. I haven't been able to find a video or anything about the final product. You can buy them complete so I thought there'd be something.

Here's an image from the publishers that show the bits floating and what is to be done. I can see how it's starting to come together.


Saturday, 18 April 2015

The Base and Stand

The Base and Stand


Issues 12 - 15

So this pack came with my free tool kit, base and main frame. 

Here's the tool kit. It's a cool wee kit that will come handy down the line, though apart from the wee scraper thing (for dislodging prints) I had the contents ;)




Me or my camera ballsed up again so I don't have pics of the bits, but here is the y-axis casing with the new y-axis bracket attached.



Next up is the "feet" of the printer. There is a left pack and a right one so I'll only post one as they are identical, just mirrored. There are three feet pads in each, but only two to be used now with one kept for later. These are pretty straight forward, rubber pads stuck to plastic mounts that screw into the base plate. These can be adjusted later to make sure everything levels out.




One lonely spare wee shoe.



Here's the main frame, attachment L-brackets and 21 small fidgety screws.



All done and third bootie attached to each side.



Well, that's that. Upright and ready to go.


According to the back of the last issue the x-axis is coming next. I guest this will be the same as the y-axis stuff. I pretty much expect it to be the exact same as the y-axis with a different mount. We shall see.

The Y-Axis Motor

The Y-Axis Motor


Issues 8 - 11

These four issues build sections were all based on the Y-Axis motor

First up is the motor control board.




Then the power supply. Just the power supply. I'm not writing a lot in this blog in general, so I can't really say much more ... it's a power plug.



Here's the y-axis runner cover.



The all important motor. This makes stuff move! ( If you didn't know ;) )




Sorry (or you might be relieved) but no pictures of fitting the motor and drive belt. Camera screwed up.

The motor control board fits into the test board from the previous issues. After plugging in the cables we can test the motor runs all right.




Here it is all running





To finish off the ruuner build for now we need to complete the enclosure.





Done, for now. Not sure what will be next. I wait with baited breath.

Oh, and the shadow at the bottom corner of most of the pics? I knwo what it is so I can avoid it in the future. I can't be hooped editing and putting the pictures back up, so I'll just have to live with it.

The Y-axis!


Issues 3 - 7

Not much to say

Well, I think it's fair to say that these posts will be more pictures than words for a while. As there was a delay in me getting started I got some stuff in "bulk". Here's the bits I got for issues 3 through 7,



So yeah, here's the base and runner holders.





Next came one of the runner bars along with another runner holder set. Obviously there's a second runner bar to be added later, but they do it one at a time to build up. The problem with this is that you affix a part then remove it, then re-affix it .... I'm trying to keep that to a minimum.



You only need a screwdriver ... my ass, part 1.

I needed to use my DIY clamps to hold parts in place while attempting to put screws in.







Assembled the runner. After checking that it slides smoothly and making an adjustments we can move on. Time to add the belt roller.


You only need a screwdriver ... my ass, part 2

Needle nose pliers required to get the holder clip in place.



Next up, adding the y-axis limit switch and cables..




In the next pack was the test control board and 4GB V3 branded pen drive,





The test board allows you to plug in the cables for components to test them before putting everything together. There's a power input, power switch and a few wee control buttons for running the components.



Next up should be the motor and motor control board. Hopefully that'll be through soon.

Questions? :)


Saturday, 28 February 2015

And so we begin ... FINALLY!


Before we begin .. The Prologue ... (Aw, Frankie Howerd)


I subscribed to the Eaglemoss series to build a 3D printer last year! It was fairly obvious that it was something I was going to do. As soon as I saw the ad I was on my computer and signing up! When I saw Steph later that day I said to her, "I've subscribed to something, a new magazine. What it is ... ", "You're getting that 3D printer thing aren't you?" .... so ... yeah :)

Weeks went by and I hadn't received anything or had any word that there was an issue. After getting in touch with Eaglemoss I received a reply saying "I'm sorry to say that there has been a delay with the launch of the collection. We are waiting to hear back from the publisher regarding the length of these delays.".

I was in ASDA later that week and saw issue 5 on the shelf. B******s. I got back in touch and was told "Yes, that is this current moment in time the collection is not going any further than issue 5. We will let you no on what happens with the rest of the collection.". Dammit. It didn't go ahead.

14th January 2015, I get an e-mail saying that they are now going ahead with the series! Get in! It said that my subscription would be automatically moved over and that as a thank you for early interest I would get issues 1 & 2 free. Fair enough. For people who actually got the original issues it wasn't as good as there was a note saying that the original 5 issue components were not compatible with the new series.

Again .. WEEKS went by with no word and no deliveries. Apparently, as the original; payment method entered into PayPal, despite the update to my PayPal payment method, my subscription was not moved over. Had to phone customer support, and to be fair the guy I got was helpful and got me sorted out.

A couple of weeks later and a package arrived, so ....

Time to start building

Actually, not so much. I'll explain why in a bit.

Here's what arrived as the first two issues. Two component packs and three things to read.



Written Materials

The three reading materials are issues one and two along with an overview of the printer that will be built. The overview includes a brief history of 3D printing. Did you know, the 3D printing process was invented in 1984?! I thought it was a hell of a lot more recent than that. That's one of the reasons I decided to subscribe to this...I wanted to learn more.



The first couple of magazines seem quite interesting. Not expansive in any way, but a good base to start from. They point towards 3D printing uses, advances, impact, etc. I think there's a lot to build off of in the future. I do worry that there won't be enough to fill the 90 odd issues. I hope to be and am sure I'll be proven wrong.

I'll write more about the magazines when I've had time to read them properly.

Component Packs

The bits that came so far aren't much, as was expected. That's why I said it's wasn't quite time to start building. Obviously I am going to follow the build details to the letter....for the most part. The instructions come and are given as if you are doing something every week. So for the first two I would be screwing things in place that I would later have to take off, add parts, and then replace the original part. I don't like that. It's just a "me" thing. I feel like it would take away from the integrity of the final build....yeah, I know.

What I've decided to do is do the build in bursts. I'll let the parts accumulate and then build sections.

Anyway, here are the first two packs. From what I can gather, they are parts of a base and running pole.



Missing?

Along with the first delivery was supposed to be the first ring binder to keep the magazines in. Well, it wasn't there. I'm assuming that this is because I had to explain to the support guy about the two free issues and they have been dispatched early as a separate entity. In my next delivery should be either issues 3+4 along with my binder, or issues 3-6 with my binder. We shall see. I'm just glad we've actually got started now :)

Next up ...

I think that posts to this blog will be pretty limited. If I'm building in bursts I'll post during the build elements, unless anything particularly interesting comes through.